Uploaded image for project: 'LIMS'
  1. LIMS
  2. LIMS-3258

Analysis DateTime Performed must be captured

    Details

    • Type: Improvement
    • Status: Open
    • Priority: Major
    • Resolution: Unresolved
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None

      Description

      Potentially only a linguistic issue. From Slack:

      "According to SANAS, ... they want a date for each of the methods. Maybe add another column after specification "date of analysis". Date performed and date of analysis captured are two different things"

      The LIMS should record the time of the analysis performance here you are right, it is generally available from instrument imports.

      The time capture is a LIMS action and is automatically logged already and available form the Analysis' audit log.

      The correct way thus would be to
      i) have a date picker on an extra compulsory column/field DateTime Performed. for manual results entry

      ii) ensure it is captured from Instrument imports where available, else enforce manual capturing thereof

        Activity

        There are no comments yet on this issue.

          People

          • Assignee:
            Unassigned
            Reporter:
            lemoene lemoene
          • Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

            Dates

            • Created:
              Updated: